The Arsenal: Infrastructure & Capabilities

Our 30,000 SQ FT distribution hub, our tech-stack, and our technical installation matrices. This is the engine that powers our nationwide rollout capacity.

The Performance Matrix

Operational Proof at Scale

Marriott client logo
Premier Inn client logo
Travelodge client logo
Whitbread client logo
Holiday Inn client logo
Holiday Inn Express client logo
Days Inn client logo
Mitchells & Butlers client logo
NHS client logo
Circle Health Group client logo
Costa client logo
PureGym client logo
Greggs client logo
Apex client logo
Marston's client logo
Miller & Carter client logo
Marriott client logo
Premier Inn client logo
Travelodge client logo
Whitbread client logo
Holiday Inn client logo
Holiday Inn Express client logo
Days Inn client logo
Mitchells & Butlers client logo
NHS client logo
Circle Health Group client logo
Costa client logo
PureGym client logo
Greggs client logo
Apex client logo
Marston's client logo
Miller & Carter client logo

Falcon Fact

In 2025, we saved our clients over £1,000,000 in material waste and carpet costs.

Strategic Fulfilment Centre

Our 30,000 SQ FT HQ at Unit 101, Potter Space keeps inventory available 24/7, enabling fast deployment without supply chain lag.

25,000+

Hotel Bedrooms Installed Annually

2,500+

Reactive Callouts Managed

1,000,000m2

Of Material Stored

The Integrated Ecosystem

Factory to Floor Operational Map

End-to-end supply chain dominance from direct manufacturing relationships to lifecycle maintenance execution.

Phase 1

Direct Manufacturing

We partner directly with manufacturers to ensure material quality and priority access.

Phase 2

FCF Fulfilment Centre

All materials flow through our 30,000 SQ FT Distribution Centre for 24/7 inventory availability.

Phase 3

Tech & Business Intelligence

We embed Data Insights and Scalable Platforms across our business to monitor every project in real-time.

Phase 4

Expert Execution

Our dedicated team of 100+ installers carries out the work across our 20+ specialised sectors.

Phase 5

The Lifecycle Loop

We provide a continuous loop of Reactive Maintenance, New Builds, Extensions, and Refurbishments with national coverage and 24/7 availability.

The Technical Arsenal

Engineering Spec Capability Matrix

Full-spectrum hard and soft flooring capability across LVT, wood, resin, ceramics, porcelain, and textile systems.

Carpets & Textiles

Structured textile systems for operationally critical environments.

  • Traditional
  • Direct/Double Stick
  • Carpet Tiles

LVT & Wood Artistry

High-end pattern execution with precision finishing and detailing.

  • Herringbone
  • Chevron
  • Basket Weave
  • Sand & Seal
  • Varnish

Technical & Resin

High-traffic / hygienic specialist wing for demanding commercial operations.

  • Epoxy
  • Polyurethane
  • MMA Resin Flooring
  • Wall Cladding

Subfloor Preparation

The dirty work covered end-to-end before the finish layer goes down.

  • Leveling
  • Latexing
  • Liquid DPM
  • Ply boarding
  • Full replacements

Ceramics & Porcelain

Commercial tiling for high-traffic environments: stadiums, leisure centres, and transport hubs.

  • Ceramic installs
  • Porcelain installs
  • Commercial Tiling

Workmanship Guarantee

Guarantee and Warranty Terms

Specifying the right system is only half the assurance. Falcon backs every delivery with manufacturer grade product cover and our own workmanship warranty protection from specification through to the finished floor.

  • Manufacturer product warranty: The full manufacturer's warranty applies to the flooring system specified for your project.
  • Installation workmanship warranty: Falcon provides a 12-month warranty on installation workmanship.

Fully accredited across health, safety, and quality management

CHAS accreditation badge

CHAS

SafeContractor certification seal

SafeContractor

Constructionline Gold Member badge

Constructionline Gold

ISO 9001 certification badge

ISO 9001

ISO 14001 certification badge

ISO 14001

ISO 45001 certification badge

ISO 45001

See all certifications