Prince Consort Village

West London£385,000+Live/Occupied Building

Key Takeaways

Project Value

£385,000+

Duration

95 Days

Building Status

Live, Occupied

Location

West London

Project Gallery

Project Overview

Scope of Works

Complete strip-out and replacement of existing floor coverings, full subfloor preparation including damp proof membrane and levelling, installation of new LVT, carpet, and safety vinyl systems, refurbishment of stair cores, and full redecoration of skirting boards and door frames throughout the six-storey building.

Technical Challenges & Solutions

  • - Early surveys revealed high moisture readings and subfloor cracking across lower levels in a live, occupied building.
  • - Falcon introduced a Liquid DPM system and reinforced resin mesh repairs to stabilise the base layer.
  • - Ardex NA latex was applied at a nominal 3 mm depth across lower and ground floors to create a resilient substrate for high-traffic use.

The Results

Completed on schedule with full sign-off from Campus Living Villages and no outstanding defects.